20-23rd July 2010
20th July 2010 - the plastering done. Roof - done.
Shaded area for dining and activities plastered, floore done, iron shade sheets - in place.
The shaded area has a strong timber construction. The timber and the sheets are hold by many screws.
The shaded area is 5 x 6.3 m.
It starts to look better and better.
22nd July 2010 - first undercoat - painting outside started.
Inside we do the ceiling, and painting.
The walls inside will be white.
This phase is slow but important.
In few weeks time we will be ready.
23rd July 2010 - the painting outside looks good - cream - yellowish colour.
In the corner of the shaded area we constructed an oven or braai (barbeque) - one of the beloved activities of the people here.
Inside we do the floors with oxide polish.